Wall Mount Basin — Pre-Tiling — Installation Guide
This guide covers installing wall-mounted Nood Co basins before tiling is complete. The mounting bracket is fixed to the wall structure, then tiling is completed around the bracket before the basin is attached.
Before you begin
- Read the full guide before starting installation
- Ensure all plumbing rough-in is complete and tested
- Nood Co concrete products are handmade — handle with care during installation
- Installation should be carried out by a licensed plumber